Loading...
Skip to main content

Closed Solicitations

(98,407 results)
98,407 results
Final Clarifier Install Metropolitan St. Louis Sewer District (MSD) Missouri Published 04/24/2025 Closed Bid 06/11/2025 443489348143
Lake Improvements: 100-amp Power Extension City of Weldon Spring Missouri Published 04/24/2025 Closed Bid 05/06/2025 443492794276
Bulk Packaging Supplies DEPT OF DEFENSE - DEPT OF THE ARMY - AMC Missouri Published 04/24/2025 Closed Bid 05/08/2025 2593773252
Air Conditioner City of St. Louis Missouri Published 04/24/2025 Closed Bid 06/03/2025 443492693569
Crowdstrike Falcon City Utilities of Springfield (CU) Missouri Published 04/24/2025 Closed Bid 05/05/2025 443492725770
ManageEngine Service Desk Plus City Utilities of Springfield (CU) Missouri Published 04/24/2025 Closed Bid 05/06/2025 443492725768
Taylor Stadium — Turf Replacement University of Missouri Missouri Published 04/24/2025 Closed Bid 05/21/2025 443491276173
Wastewater Treatment Services-MTC State of Missouri - Department of Corrections (MODOC) Missouri Published 04/24/2025 Closed Bid 05/21/2025 443491632210
CC Depository Bank Services County of Taney Missouri Published 04/24/2025 Closed Bid 05/23/2025 443491468487
Butts Road Bridge Replacement County of Crawford Missouri Published 04/23/2025 Closed Bid 05/20/2025 443491274071
High Point Road Bridge Replacement County of Crawford Missouri Published 04/23/2025 Closed Bid 05/20/2025 443491276193
Roof Replacement - Franklin Building Farmington School District Missouri Published 04/23/2025 Closed Bid 05/16/2025 443491678269
Job J9P3745 Route 34 BOLLINGER County. Intersection improvements and ADA improvements at the intersection of Route 51 in Marble Hill, the total length of improvement being 0.172 miles. State of Missouri - Department of Transportation (MoDOT) Missouri Published 04/23/2025 Closed Bid 05/16/2025 443491912279
Job J6S3435 Route 30 FRANKLIN, JEFFERSON County. Coldmill, resurface and crack fill bridges from I-44 to Route PP in Jefferson County near High Ridge, the total length of improvement being 30.404 miles State of Missouri - Department of Transportation (MoDOT) Missouri Published 04/23/2025 Closed Bid 05/16/2025 443491912265
Job JSEM0086 Route I-55, I-57 VARIOUS County. Interstate Striping all of I-55 and I-57, the total length of improvement being 374.716 miles. State of Missouri - Department of Transportation (MoDOT) Missouri Published 04/23/2025 Closed Bid 05/16/2025 443491912284
Job JSEM0081 Route 95 OZARK County. Slope repair at Little North Fork White River, the total length of improvement being 0.301 miles. State of Missouri - Department of Transportation (MoDOT) Missouri Published 04/23/2025 Closed Bid 05/16/2025 443491912283
Job J6P3639 Route Various ST LOUIS, ST LOUIS CITY County. Job Order Contract for Guardrail repair in St. Louis City and St. Louis County, the total length of improvement being 0 miles. State of Missouri - Department of Transportation (MoDOT) Missouri Published 04/23/2025 Closed Bid 05/16/2025 443491912263
Job JSL0202 Route Various JEFFERSON, ST CHARLES, ST LOUIS, ST LOUIS CITY County. Dynamic message sign replacements at various locations in the St. Louis District, the total length of improvement being State of Missouri - Department of Transportation (MoDOT) Missouri Published 04/23/2025 Closed Bid 05/16/2025 443491912268
Job JSL0073 Route 100 ST LOUIS CITY County. Coldmill and resurface from I-55 to St. Louis City limit at Maplewood, the total length of improvement being 6.759 miles. State of Missouri - Department of Transportation (MoDOT) Missouri Published 04/23/2025 Closed Bid 05/16/2025 443491912267
Job JSL0044 Route 21, N JEFFERSON County. Resurface, guardrail, signals, signage and ADA improvements on Route 21 from Big River to Route B; on Route N from Route 21 to Donnelly Street near De Soto, the State of Missouri - Department of Transportation (MoDOT) Missouri Published 04/23/2025 Closed Bid 05/16/2025 443491912266
Job JSE0248 Route AA SCOTT County. Bridge replacement over Route 60 near Sikeston, the total length of improvement being 0.388 miles. State of Missouri - Department of Transportation (MoDOT) Missouri Published 04/23/2025 Closed Bid 05/16/2025 443491912282
Job JSE0103 Route YY DUNKLIN County. Resurface from Route 164 to end of state maintenance, the total length of improvement being 0.516 miles. State of Missouri - Department of Transportation (MoDOT) Missouri Published 04/23/2025 Closed Bid 05/16/2025 443491912285
Job J9P3796 Route 49 IRON, WAYNE County. Seal seal, resurface and add shoulders from Route 21 to Route 34 near Piedmont, the total length of improvement being 28.633 miles. State of Missouri - Department of Transportation (MoDOT) Missouri Published 04/23/2025 Closed Bid 05/16/2025 443491912280
Job J7S3059B Route FF JASPER County. Roadway realignment, intersection improvements and ADA improvements from Davis Blvd to Stephens Blvd in Joplin, the total length of improvement being 0.378 miles. State of Missouri - Department of Transportation (MoDOT) Missouri Published 04/23/2025 Closed Bid 05/16/2025 443491912274
Job J9P3632 Route Various VARIOUS County. JOC for asphalt pavement repair at various locations in the Southeast District, the total length of improvement being 0 miles. State of Missouri - Department of Transportation (MoDOT) Missouri Published 04/23/2025 Closed Bid 05/16/2025 443491912278

Your search returned no results.

suggestions:

  • Make sure that all words are spelled correctly.
  • Try different words that mean the same thing.
  • Try more generic terms.

of 400