The work under this Contract consists of all labor, material and equipment required to construct an additional 7,580 foot section of the Bronx River Pathway between Crane Road Bridge and Green Acres Avenue in Scarsdale, NY to link up two existing paved pathways. The pathway will be approximately 12-ft wide and includes two bridge crossings of existing stormwater outfalls.(Bid Estimate is $5.2-5.6 Million)