This project proposes to install 7 new light poles with fixtures and electrical conduit/wiring mounted
with video surveillance cameras including all associated hardware, mounting brackets, cabling, software,
associated support, warranty, and training for Gilcher-Crissman Park in Washington Township, MI. There
is an existing electrical meter to connect to for electrical conduit/wiring going to light fixtures and
cameras – location noted on lighting plan sheet. One (1) camera shall be mounted to each pole. Final
direction will be determined with the awarded contractor. The bidder/contractor will provide all labor,
materials and equipment to complete the project and will be responsible for verifying all measurements
and information prior to starting work. The contractor is responsible for jobsite cleanup and for hauling
any debris created as a result of the project to an approved disposal facility (assuming Type II Landfill)
per the environmental documents dated April 20, 2002, July 22, 1999, October 17, 2002, and September
23, 2003 (attached). This site has been officially recognized as a “facility” in the attached environmental
documents so no excavated material can be used offsite and there must be a one-foot clean topsoil cap
above any contaminated fill.