Summary of Specifications:
A. DEMOLISH AND REMOVE SPECIFIC PIPING, AND CONCRETE PUMP PAD IN AN ORDER AND IN SETS OF TIME TO MINIMIZE INTERFERENCE WITH CONTINUOUS SLUDGE PUMPING IN THE GALLERY. PROVIDE, INSTALL, TEST, AND START UP ONE VOGELSANG USA PUMP AND ONE VOGELSANG USA GRINDER AND RELATED PANELS AND CONTROLS FOR EACH, AS WELL AS ASSOCIATED PIPING, FITTINGS, VALVES AND OTHER APPURTENANCES IN THE PRIMARY SLUDGE GALLERY AT THE PLANT. B. PROVIDE AND INSTALL CONDUITS AND WIRING TO CONNECT NEW EQUIPMENT AND PANELS TO EXISTING PANELS CONTAINING EXISTING POWER SOURCES AND REMOTE MONITORING AND CONTROL INPUT/OUTPUT TERMINALS. C. PROVIDE SUBMITTALS AND UPDATED AS-BUILT DOCUMENTATION. D. THIS PROJECT DOES NOT INCLUDE SOFTWARE PROGRAMMING, OTHER THAN THAT INCLUDED IN THE STANDARD PUMP AND GRINDER CONTROL PANEL PACKAGES. E. PROVIDE MANUFACTURER-SUPPLIED TRAINING, ON-SITE AND IN-FACTORY. F. PROVIDE ALL OTHER MISCELLANEOUS CIVIL, STRUCTURAL, MECHANICAL, ELECTRICAL AND INSTRUMENTATION ITEMS OF WORK AS INDICATED IN THE CONTRACT DOCUMENTS AND AS REQUIRED FOR A COMPLETE FUNCTIONAL SYSTEM. G. DEMONSTRATE PROPER FUNCTIONING EQUIPMENT. THE REQUIRED PROJECT COMPLETION SCHEDULE IS VERY STRICT. H. WARRANT EQUIPMENT AND LABOR FOR 1 YEAR AFTER FINAL ACCEPTANCE