The City of Taylor is accepting proposals for the TIFA INKSTER SIDEWALK PROJECT In the City of Taylor, Wayne County, Michigan
The proposed project includes sidewalk construction along the east side of Inkster just north of Northline Road. The anticipated start date, weather permitting, is July 15, 2021.
Bids are due and shall be publicly opened at the following time and location:
Monday, June 14th, 2021, at 3pm (EST)
Cindy Bower, City Clerk City of Taylor
23555 Goddard Road
Taylor, Michigan 48180
All RFI’s shall be emailed to Alan J. Cruz, PE, ajcruz@hengineers.com. (No calls) The deadline for Request for Information (RFI) is Thursday, June 10th, 2021, 10 am EST.
Contract Documents (specifications and plans) will be available for download through BidNet.
Provide (2) copies of the bid and a surety in the form of a certified check, bank draft, or bid bond, in the sum of five percent (5%) of the amount of the proposal. The OWNER reserves the right to waive any information or to reject any and/or all bids. Bidders may not withdraw their bid within 90 days after the date of bid opened.