2019-01-16-1000(1) - Sharon Drive and Gilman Avenue Reconstruction

Print
Closed Bid

Get instant access

to solicitation details & future business opportunities.

Get Access

Vendor packages with access to similar open solicitations

Statewide

Matching bid notifications & access to all Statewide & Group bid details

Group

Matching bid notifications from participating agencies

Basic

Access participating agency bids

Basic Information

Reference Number

0000204359

Issuing Organization

City of Garden City

Owner Organization

City of Garden City

Project Type

ITB - Invitation to Bid (Formal)

Project Number

2019-01-16-1000(1)

Title

Sharon Drive and Gilman Avenue Reconstruction

Source ID

PU.AG.USA.2429.C8654051

Details

Location

United States, Michigan, Wayne County

Job Location

Sharon Drive (Maplewood to Elizabeth) & Gilman Avenue (Maplewood to Cambridge)

Piggyback Contract

No

Dates

Publication

12/06/2018 09:40 AM EST

Question Acceptance Deadline

12/11/2018 12:00 AM EST

Questions are submitted online

No

Closing Date

01/16/2019 10:00 AM EST

Contact Information

Ryan Kern, Project Manager

rrkern@hengineers.com


Description

INVITATION TO BID
CITY OF GARDEN CITY
WAYNE COUNTY, MICHIGAN
SHARON DRIVE RECONSTRUCTION – MAPLEWOOD TO ELIZABETH
GILMAN AVENUE RECONSTRUCTION – MAPLEWOOD TO CAMBRIDGE
 
The City of Garden City is accepting proposals for the
SHARON DRIVE RECONSTRUCTION – MAPLEWOOD TO ELIZABETH
GILMAN AVENUE RECONSTRUCTION – MAPLEWOOD TO CAMBRIDGE
in the City of Garden City, Wayne County, Michigan
 
This proposed project involves the complete reconstruction of Sharon Drive from Maplewood
Avenue to Elizabeth Drive and Gilman Avenue from Maplewood Avenue to Cambridge Avenue with
a total length of approximately 2,550 lineal feet. This project will also involve the replacement of
storm sewer crossings, replacement of defective sidewalks, placement of new sidewalks where
sidewalk currently do not exist and sidewalk handicap ramp installation to current ADA
requirements. In addition, the existing water main will be replaced with a new water main by means
of directional drilling. The anticipated start date, weather permitting, is April 15, 2019 and
substantially completed by September 1, 2019 with final completion by September 30, 2019.

Two (2) copies of the bid proposals will be received by:
Michelle Mastej, Interim City Clerk-Treasurer
City of Garden City
6000 Middlebelt Road
Garden City, Michigan 48135
Until Wednesday, January 16, 2019 at 10:00am (local time)

Bids shall be publicly opened and read on:
Wednesday, January 16, 2019 at 10:00am (local time) at:
City of Garden City
6000 Middlebelt Road
Garden City, Michigan 48135

The Contract Documents may be examined at the City of Garden City Clerk’s Office, Hennessey
Engineers, Inc., Southgate, Michigan, Construction Association of Michigan, Bloomfield Hills,
Michigan, Construction Journal LTD, Stuart, Florida and CDC News Construction Journal, Vero
Beach, Florida

Contract Documents will be available starting Wednesday, December 5, 2018 after 1:00pm and
may be purchased at: Hennessey Engineers, Inc., 13500 Reeck Road, Southgate, Michigan, 48195
upon payment of a fee of $60.00 per set, $75.00 if mailed, which is nonrefundable. Cash and check
only accepted. Also, plans are now available on CD for a fee of $15.00 per CD or if mailed, $25.00.

Bidders must deposit, with their bid, surety in the form of a certified check, bank draft, or bid bond, in
the sum of five percent (5%) of the amount of the proposal. The OWNER reserves the right to waive
any information or to reject any and/or all bids. Bidders may not withdraw their bid within 60 days
after the date of bid opened. The Contractor shall be aware that per the City of Garden City
Ordinance No. 91-001, no less than the prevailing salaries and wages noted in the General Wage
Decision (Federal Wage Determination) shall be paid on this Project.
City of Garden City
Michelle Mastej, Interim City, Clerk-Treasurer

See more

Buyer’s Requirements

General Requirements

- Bid Deposit Required

- Insurance Required

- Warranty Information Required

- Prevailing Wage Required

Bonding Requirements

- Bid Bond

5 %

Bid Submission Process

Bid Submission Type

Physical Bid Submission

Please note that solicitations issued prior to June 10, 2017 can be found here: http://legacy.mitn.info