It is the declared and acknowledged intention and meaning of this Quote to provide and secure timely, responsive, and satisfactory removal and replacement of the Regency Oaks Entranceway Landscape located on the north and south sides of Breakwater Boulevard and U.S. 19 in front of the Regency Oaks Subdivision entrance walls. The successful bidder shall furnish all services, labor, materials, equipment, tools, insurance, permits, and fees (if any) necessary to perform the removal and replacement of the landscaping as described in this Contract.
The Scope of Work includes the submittal of a landscape design and the removal and installation of new landscaping. This project has a budget of $10,000.00. The Vendor/Contractor shall submit the completed Invitation to Quote form and their drawings of the landscape design showing layout, plants, etc.