Loading...
Skip to main content

RFP2018-PW002 - HRRR Grant Roadway Improvement Project


Print
Closed Bid

Get instant access

to solicitation details & future business opportunities.

Get Access

Vendor packages with access to similar open solicitations

Statewide

Matching bid notifications & access to all Statewide & Group bid details

Group

Matching bid notifications from participating agencies

Basic

Access participating agency bids

Please note that solicitations issued prior to September 07, 2016 can be found here: http://legacy.rockymountainbidsystem.com

Basic Information

Reference Number

0000189175

Issuing Organization

Pueblo West Metropolitan District

Owner Organization

Pueblo West Metropolitan District

Project Type

RFP - Request for Proposal

Project Number

RFP2018-PW002

Title

HRRR Grant Roadway Improvement Project

Source ID

PU.AG.USA.2461.C2710126

Details

Region

United States, Colorado, Pueblo County

Job Location

Pueblo West, CO

Road Name

See Bid Documents

Length

See Bid Documents

Piggyback Contract

No

Dates

Publication

04/16/2018 01:02 PM MDT

Question Acceptance Deadline

05/09/2018 05:00 PM MDT

Questions are submitted online

No

Closing Date

05/16/2018 02:00 PM MDT

Contact Information

Bradley Curtis, PE, LEED AP

719-547-5061

BCurtis@pwmd-co.us


Description

Three (3) separate HRRR Grants were awarded to the District in 2017.  In general, they are to address traffic flow, safety and congestion as the community continues to grow. Various residents, officials and emergency responders have communicated their safety concerns and the District has prepared preliminary efforts on roadway geometry modifications that can minimize the current issues.The three (3) projects are as follows:

A. Capistrano Ave Turn Lanes – CDOT Project # M087-010 (22355)

  1. The High School drive will be widened to allow for additional right turn lanes for approximately 250 feet.  This will allow exiting right turning vehicles, who are currently being unduly constrained because of left turning vehicles long wait for gaps in Capistrano traffic, to enter the roadway easily and safely because they only have to yield to vehicles approaching from their left.
  2. Additionally, on Capistrano Ave. both a right turn deceleration lane and a center left turn lane will be constructed to this driveway.
  3. These improvements will eliminate the problem of queued vehicles sitting in a through traffic lane waiting to make a left turn.  These improvements will come close to eliminating the rear end near-miss problem.
B. Platteville Blvd Turn Lanes – CDOT Project #M087-011 (22356)
  1. A dedicated “free-flow” right turn lane for north bound traffic would be constructed.  Vehicles would then flow around a “pork chop” type island into an eastbound right turn acceleration lane until they can merge with eastbound through traffic.
  2. These improvements will eliminate the problem of near misses because of queued vehicle lengths, impeded school busses and emergency vehicle delays.
C. Spaulding Ave Roundabout – CDOT Project #M087-012 (22357)
  1. The project consists of a 3-leged roundabout to be constructed at the intersection of Spaulding Ave/Capistrano Blvd.  The Colorado Department of Transportation allowed Pueblo West and Pueblo County to use HES funding to construct its first roundabout in Pueblo West in 2015 at the intersection of Platteville and Purcell.  Pueblo West citizens are now comfortable with roundabout operations and we have experienced a significant accident reduction as a result of the roundabout installation.

See more

Buyer’s Requirements

General Requirements

- Insurance Required

- Bidder Prequalification/Preregistration Required

- Installation Required

- Prevailing Wage Required

- License Required

- Federally Funded

- Certified Payroll

Bid Submission Process

Bid Submission Type

Physical Bid Submission