Separate sealed bids for 2020 Asphalt Overlay Project, Douglas County Project Number CI 2020-003 will be received by the Owner, Douglas County Government, Department of Public Works Engineering, Philip S. Miller Building, 100 Third Street, Suite 220, Castle Rock, CO 80104, until Tuesday, February 11, 2020, at 3:00 p.m. This project consists of This project consists of placement of 1,000 tons of hot mix asphalt patching and 92,106 tons of hot mix asphalt overlays at various locations throughout Douglas County as part of Schedule A. The project also includes placement of between 12,282 tons and 18,423 tons of hot mix asphalt overlay using one of three methods (conventional rotomill and overlay, hot in-place recycling and repaving, or surface recycling combined with overlay) on Flintwood Road and Singing Hills Road in Douglas County.
The Contract Documents will be available after 10:00 a.m. on Monday, January 13, 2020, through Rocky Mountain E-Purchasing System Website (www.rockymountainbidsystem.com) or they may be obtained at the above address. Electronic versions of the Plans obtained by any other means than as described above may not be complete or accurate, and it is the Bidder’s responsibility to obtain a complete set of the Project Plans and Specifications. Douglas County will not be held responsible for misinformation received from private plan rooms.
A pre-bid conference will be held at 10:00 a.m. on Wednesday, January 22, 2020, at the Department of Public Works Engineering, Philip S. Miller Building, 100 Third Street, Suite 220, Castle Rock, CO 80104. All questions are due to Daniel Roberts, P.E., Project Engineer by 12:00p.m. on Tuesday, January 28, 2020. The Bid Opening will be conducted at 3:00 p.m. on Tuesday, February 11, 2020, at the same address.
The Project includes the following major items:
- Removal of Asphalt Mat
- Reset/Adjustment of
Manholes/Water Valve boxes
- Removal/Replacement of pavement markings
- Unclassified Excavation
- Aggregate Base Course
Prior to submitting a Bid Proposal, Bidders shall have received prequalification status (active status) with the Colorado Department of Transportation to bid on individual projects of the size and kind of work as set forth herein.
Any questions on the bidding process shall be directed to Daniel Roberts, P.E., Project Engineer at 303.660.7490.
Plan holder information, can be found on the Rocky Mountain E-Purchasing System Website.
NEWS-PRESS
First Publication: January 9, 2020
Second Publication: January 16, 2020
Account Number: 00012184
DAILY JOURNAL
Publication Date: January 9, 2020
(only one run for DJ)