Specifications include, but are not limited to: The Work includes and consists of furnishing all labor, operations, materials, accessories, incidentals, services and equipment indicated, specified, mentioned, scheduled or implied per the Bid Documents for work on the specific aforementioned project. The specific Work includes: Contractor shall furnish all labor, materials, services and equipment required to install adiabatic fluid coolers, heat exchanger, pumps, glycol feeder, controls and accessories to add water-side economizer to the chilled water plant in the Plant Operations Building; and install pumps, piping, controls and accessories to upgrade the heating water distribution from the campus’s North Central Plant to the Health Sciences Building and Pathfinder Building. Controls will be connected to existing Building Management System (BMS). All materials, services and/or work not specifically mentioned, including demolition and rework, which are necessary in order to provide a complete project shall be included in the bid and shall conform to all Local, State, and Federal requirements in accordance with the requirements, terms, specifications, conditions, and provisions hereinafter contained.