Specifications include, but are not limited to: At the Depot Park is an existing fountain. The project will include removing the fountain and installing a splash pad facility along with a precast concrete restroom. The splash pad facility will be triggered by users and designed age appropriate for toddlers to adults to enjoy during the summer months. The waste water from the facility will drain to a collection tank where water can be used for park irrigation and excess water drained to the existing site storm sewer. The precast concrete restroom building will have water, sewer and electrical connections and sit on a compacted gravel base with concrete skirting. Water, electrical, sewer and storm drain connections are available onsite but must be brought to the restroom. The project will include design and construction of the splash pad as well as some demolition of existing concrete and excavation prep for the final construction. There are water, electrical sanitary and storm water connections to be completed as part of the installation. The splash pad is intended to be a drain to waste system with some of the water collected for park irrigation. Installation of the collection tank, irrigation equipment and controls should be priced as an add alternate in this first phase of the park development.