Specifications include, but are not limited to: Furnishing all labor, operations, materials, accessories, incidentals, services and equipment indicated, specified, mentioned, scheduled or implied per the Bid Documents for work on the specific aforementioned project. The specific Work includes: replace the burners on boilers B-2 and B-3. Design of burner, gas train, plate, etc. to be certified by burner manufacturer. The existing boilers are Kewanee fire tube firebox boilers. The boilers provide heating hot water to the LCCC campus. This project is to be phased. Only one burner is to be replaced at a time as specified in the contract documents. Install new motorized control dampers and actuators from the draft control system as part of the base bid for all three boilers (B-1, B-2 and B-3) for heat retention inside the boilers.