Furnishing labor, equipment, supplies, and materials, to reconstruct a native surface road. The work includes ripping, reshaping the roadway, reestablishing ditches, reducing and removing from the roadway rock larger than 4 inches; watering, mixing, blading and shaping, compacting, and placement of surface rock and stabilization.
1. The reconstructed Shoshone Lakes Road width shall be a minimum of fourteen (14) feet for approximately 2.6 mile.
2. Stabilization ¿ The chemical treatment of Perma-Zyme 11x TM
a. Shall be the entire length and width of the roadway and shall be six (4) inches deep as per manufactures specifications.
b. Shall include watering needed for compacting
3. Apply seed to staging areas and any additional disturbed areas outside of the ditches identified by the Government with approved BLM seed mixture.
Minimum Requirements for a Responsive Proposal
1. Filled out, dated, priced SF1442
2. Technical Response - See Section L and M for details
3. Bid Bond 20%