Specifications include, but are not limited to: internal relining and rehabilitation of approximately 1,740 L.F. of 18-inch and 21-inch RCP gravity wastewater pipeline. These pipelines are currently in service by the OWNER at the OWNER’s wastewater treatment facility. They are used to direct sanitary sewer flow from a point of beginning at the facilities influent control structure to various points within the OWNER’s treatment facilities by means of control structures until flow reaches the facility’s effluent structure, prior to its discharge point. In addition, the project includes the internal relining of the diversion structures and inline manholes including the installation of one new manhole and the removal and replacement of the sluice gates with varying diameters and stem lengths in each of the diversion structures. The project will require bypass pumping and plugging equipment, CCTV inspection, and high-pressure cleaning in addition to the aforementioned items.