The work includes, replacing an existing fiber cement panel façade with a combination of prefabricated and field applied exterior insulation finish systems. The work also includes new cantilevered tapered parapet coping and the application of an elastomeric coating over existing portland cement wall finish and accent banding. The demolition includes the removal of existing fiber cement panels, air barrier (Tyvek), 2” and 3” thick foil faced rigid insulation, “Z” shaped furring and tapered parapet coping as required to expose the existing gypsum building sheathing and concrete masonry back up wall construction. The new EIFS systems will be adhered to the existing gypsum building sheathing and concrete masonry back up wall construction.