The project scope includes improvements with multiple alternates if awarded. The Rawhide Elementary School improvements project Base Bid scope involves the removal of 1007 SY of AC and PCC surfacing; 19 SY of PCC stair, handrails and components; installation of 1007 SY of varying PCC sidewalk with and without thickened edge, ADA ramps; installation of 19 SY of PCC stair with embedded handrail; associated base course and subgrade preparation; minor earthwork. Scope also includes remove and replace exterior light pole, conduit, and components, remove and replace minor fencing, remove and replace water valve, remove landscaping and install sod landscaping, remove and replace irrigation system and components. Project Alternate 1 Bid scope expands to additional areas around the school and involves the removal of 449 SY of AC and PCC surfacing; 13 SY of PCC stair, handrails and components; installation of 449 SY of PCC sidewalk with thickened edge; installation of 13 SY of PCC stair with embedded handrail; associated base course and subgrade preparation; minor earthwork. Project Alternate 2 Bid scope expands to additional areas around the school and involves the removal of 333 SY of AC and PCC surfacing; installation of 209 SY of PCC sidewalk with thickened edge; installation of 124 SY of PCC valley gutter; associated base course and