Remove and replace approximately 704 LF of 6” and 8” PVC water main with standard trenching, abandon and horizontal directional drill approximately 873 LF of joint restrained 8” C900 PVC water main, 507 LF of 1” poly services, including fire hydrants, test stations, valves, fittings, curb stops, and appurtenance replacement and upgrades within O’Hara Drive from Butler Spaeth Road to the end of the O’Hara Drive cul-de-sac, and within O’Henry Court. Also includes minor upgrades and adjustments to sanitary sewer manholes. Includes varying width of full depth pavement removal and replacement along O’Hara Drive and O’Henry Court. Full depth removal and replacement of approximately 3,591 SY of asphaltic concrete pavement and aggregate base course to support utility efforts, along with minor improvements to adjacent concrete curb and gutter, driveways, valley gutters, fillets, ADA ramps, sidewalk, hydrant splash pans, and landscaping as appropriate and identified in the plans.