This is a COMBINED SYNOPSIS AND SOLICITATION
A. Background
The Fox Park Work Center currently has an antiquated electrical system that is faulty, dangerous and needs replacement. The Work Center currently has a 100-amp service that we’d like to upgrade to a 200-amp Service. Before we upgrade to a 200-amp service, we need to replace the entire electrical system for function and safety. During a recent inspection, the Forest Service found several concerning items:
- Main power disconnect only turns off 1 phase (safety hazard)
- Spliced neutral underground
- Disconnects wired to pile doesn’t have a ground or a neutral
B. The Scope of Work for the Fox Park electrical upgrade includes:
- Design a new electrical system for the Fox Park Work Center following all provisions provided in the 2018 ICC Commercial Building Code and the 2018 ICC International Mechanical Code
- Remove and Replace all power panels and breaker boxes (includes all 5 buildings, electrical station #1 and electrical station #2). The contractor must rewire the existing system to accommodate the new configuration. The Contractor must provide weatherproof electrical boxes for outside use
- Remove and replace all buried wire to be replaced with new grounded power (estimated 630 linear feet)
Project Location:
The Fox Park Forest Service Work Center is in Fox Park, WY off FS road 512 (off WY HWY-230)
In accordance with FAR 36.204, the estimated magnitude of construction for this project is between $25,000 and $100,000
Contractors are required to be actively registered with the System for Award Management (SAM) https://www.sam.gov prior to submitting a proposal and to be considered for award. Registering in the SAM system is free. If you need assistance, please be sure to reach out your local Procurement Technical Assistance Center (PTAC) representative. PTAC is a free resource to all small business and your state representative’s contact information can be found at the following website: https://www.aptac-us.org/.
All future information about this acquisition, including amendments, will be distributed solely through this site. Interested parties are responsible for monitoring this site to ensure that they have the most up-to-date information about this acquisition. All responsible sources may submit a response to this announcement which will be considered by this agency.