This project description is as follows. The existing building is a single story masonry structure. Half of the building serves as the Administration Building for FCSD #1, and the other half of the building serves as the Pathfinder High School. The FCSD #1 Administration wing was remodeled in 2014. The Plans and Specifications here in referred to as the Contract Documents outline the scope of work for the remodel of the Pathfinder High School. The proposed work includes, but not limited to: Asbestos abatement, new flooring, new casework, new lay in acoustical ceiling grid and tile, new led light fixtures, new plumbing fixtures, new doors set in existing hollow metal frames, a new window looking from the Office to the exterior of the building, (2) new windows in the Counselors Office, new paint through out, a new entrance canopy and concrete entry, and associated Alternates as, and if selected by the Owner.