• Verification of existing roof drain system function. • Demolition of the solar panel system and stands to decking substrate. • Demolition of the solar panel system related piping, and electrical components. • Demolition and replacement of the existing roof system, including: o Roof to decking substrate (31,500 SF) o Masonry wall coping caps (1,295 LF) o Curbs and equipment supports o Roof drain and leader connections (29 Ea) o Conduits, fans, vents, and heat stack flashings o Skylights (38 Ea) o Roof hatch (1 Ea) • Installation of: o (1) Ply SBS Base and (1) PLY Mineral Cap In Cold Adhesive (31,500 SF) o Vapor Barrier (17,600 SF) o Coping Cap (1,295 LF) o Non-Fleece Kee Wall Flashing System o PVC Clad Metal Counterflashing o Expansion joints o Skylight Domes (38 Ea) o Roof hatch (1 Ea)