Work for the Edinburgh Street project consists of all work and items as listed in the design plans for Edinburgh Street. The major work items are as follows: • Remove, replace, and extend the asphalt road of Edinburgh Street from the intersection Dunphail Street and Murray Street consisting of approximately 10,500 SY. • Remove and replace approximately 5,300 LF of curb and gutter. • Remove and replace approximately 100 SY of concrete valley pans. • Remove and replace approximately 900 SY of concrete flatwork. • 26 ADA accessible ramps. • 1 sampling station. • 10 fire hydrants. • Approximately 3,000 LF 6-inch and 8-inch PVC water main • 31 water main fittings and appurtenances. • 24 water service lines. • Approximately 3,900 LF of 10-inch and 12-inch sanitary sewer pipe. • 14 sanitary sewer manholes. • 24 sanitary sewer services. • Approximately 2,900 LF of 15-inch, 18-inch, and 24-inch of HDPE storm sewer pipe. • 17 storm sewer manholes.