Specifications include, but are not limited to: The project consists of the following work on Westridge Circle (Westridge Ter to Westridge Dr), Westridge Ter (15th St to Westridge Cir), and Westridge Circle (Westridge Ter to Westridge Dr): • Water, Sanitary Sewer, Storm Sewer, Drainage, Asphalt, Sidewalk/Curbwalk, and ADA Improvements.; • The Local Assessment District (LAD) process will be included with this project.; A. Design Phase.: 1. The Consultant shall meet with City representatives to discuss proposed project configuration and layout.; 2. The Consultant shall conduct field surveys to collect topographic data, existing utilities, and surface elevations for the purpose of providing an appropriate alignment and to establish grades needed to provide positive drainage throughout the corridor.; 3. The Consultant shall prepare plan sheets that have been approved and signed by a licensed Professional Engineer registered in the State of Wyoming. The plan sheets shall include the proposed area showing the final elevations, grades, alignments, typical sections, right-of-way and utility plans, and all details necessary for construction, and other details necessary to insure safe passage for the public. ; B. Project Manual.: 1. Consultant shall prepare Technical Specifications covering the required work for the Project.; 2. Consultant shall prepare Construction Drawings and Specifications in accordance with the City of Casper Standard Specifications for Public Works Construction and Infrastructure Improvements.; 3. General Conditions and Supplemental Conditions of the Specifications shall be based on current City of Casper approved documents. ; C. Final Bidding Documents.: 1. The Consultant shall provide the City Engineering Office one (1) hard copy set (paper) and one (1) digital PDF set of Bidding Documents at the completion of the design. The Consultant shall affix his registration stamp, date, and signature to the Bidding Documents in accordance with Wyoming State Registration Statutes.; 2. The Consultant shall submit to the City, at a minimum, final drawings consisting of plan sheets showing all necessary details related to this project, and as follows: a. Title Sheet that shows the project limits and location with respect to the surrounding region. This sheet shall also have an index and legend. The sheet shall bear the Consultants registration stamp, date and signature.; b. Typical Section of the roadway with dimensions and stationing.