Specifications include, but are not limited to:. Approximate Quantities: Asphalt Roadway Pavement Removal 4,700 SY Remove Exist. Curb and Gutter 2,550 LF Shaping and Grading of Roadway Base 1 LS 7" Thick of 1-1/4" Crushed Limestone Base Course 4,580 SY 2" Thick of ¾" Crushed Limestone Base Course 4,580 SY 3" Asphalt Binder Course - 3 LT 58-28 S 4,580 SY 2" Asphalt Surface Course - 4 LT 58-28 S 4,580 SY 30" Reinforced Concrete Curb & Gutter 2,550 LF Concrete Driveway Approach Replacement 1,580 SF Asphalt Driveway Approach Replace ment 760 SF Storm Sewer - 12" through 21" RCP 1,040 LF Storm Manhole 7 EA Storm Catch Basin 8 EA 8" PVC Water Main 1,200 LF 8" Gate Valve 2 EA Hydrant 4 EA 6" Hydrant Gate Valve 4 EA 6" PVC Hydrant Lead 30 LF 1-1/4" Polyethylene Service Lateral 790 LF Curb Stop and Box 25 EA Grass Restoration (4" Topsoil & Hydro-seed) 1,000 SY