Specifications include, but are not limited to: 3/8 Inch Hot Patch Asphalt Material- Mixed at 325 degrees, 1100lbs sand, 350lbs 1/4” lime stone chip, 440lbs 3/8” lime stone chip 5.5% asphalt liquid (1 ton batch or equivalent). 1/4 Inch Hot Patch Asphalt Material- Mixed at 325 degrees, 1100lbs sand, 790lbs 1/4” lime stone chip, 5.5% asphalt liquid (1 ton batch or equivalent). High Performance Cold Patch Material- Mixed at 175 degrees, 190lbs 1/4” lime stone chip, 4.5% cold patch/liquid blend/asphalt liquid (1 ton batch or equivalent). Fiber-Mix Cold Patch Material- Mixed at 180 degrees, 1145lbs sand, 695lbs 1/4” lime stone chip, 6lbs polyester fiber, 5.75% cold patch blend/asphalt liquid (1 ton batch or equivalent).