Specifications include, but are not limited to: A. Obtaining all applicable permits. B. Construction management. C. Preparation of a detailed installation plan and schedule. D. Removal and disposal of existing automatic gate on Lane 2 (Drawing No. 1). E. Replacement of existing scanner and remote terminal on Lane 3. F. Furnish and install one (1) above ground truck scale in the location shown on Drawing No. 1 (Lane 2). G. Furnish and install credit card reader kiosk Lane 2. H. Furnish and install scanner and remote terminal on Lane 2. I. Furnish and install overhead camera for new scale (Lane 2). J. Furnish and install stop/go lights on new scale (Lane 2). K. Furnish and install replacement credit card reader kiosk on Lane 1. Remove existing. L. All electrical wiring, conduit and connections. M. Integration of new equipment with Outagamie County’s existing Paradigm Software system for managing all data from the new and existing scales. N. Restoration.