Specifications include, but are not limited to: Estimate of Principal Items: Excavation Common, 4,558 CY; Borrow, 24,679 CY; Base Aggregate Dense, 3,904 Ton; Marking Epoxy, 115,764 LF; Construction Staking, 45,671 LF; Construction Staking, 9 Each; Construction Staking, 1 LS; Culvert Pipe Corrugated Steel, 316 LF 18“, 72 LF 24“, 48 LF 30“; Culvert Pipe Reinforced Concrete, 162 LF 36“, 194 LF 30“; Culvert Pipe Reinforced Concrete Horizontal Elliptical, 64 LF 34“ X 53“, 126 LF 68“ X 106“; Concrete Curb and Gutter, 444 LF; Beam Guard, 973 LF; Beam Guard Energy Absorbing Terminals, 12 Each; Asphaltic Surface, 179 Ton; HMA Pavement, 20,878 Ton; Removing Asphaltic Surface Milling, 109,751 SY; Tack Coat, 13,816 Gals; Signs, 329 SF; Foundation Backfill, 850 CY; Temporary Water Diversion, 2 LS.