Specifications include, but are not limited to: Apply synthetic track surfacing in dry weather when the existing surface and atmospheric temperatures are fifty (50) degrees Fahrenheit or above, and are anticipated to remain above fifty (50) degrees Fahrenheit for twenty-four (24) hours after completing application. The maximum temperature cannot exceed one hundred five (105) degrees Fahrenheit at any point during a 24 hour period during or after completing application. ; Rain cannot be falling. If there is a threat of rain, work shall cease until dry conditions can be reestablished on the track surface. Work is to proceed only when adequate curing can be guaranteed by the contractor. ; Use steel tapes, transits, and other surveying equipment which will allow that precise measurement of distances and angles. All lanes start and finish lines shall be 2" in width. All markings shall be colored coded. Exchange zone indicators to be diamonds or other symbol as selected by the OWNER. Minimum size shall be 12" in width. Acceleration marks shall be dashed lines 2" by 20" marked in the center of the lane. Provide four (4) sets of 3' high lane numbers. Provide event identification in the form of 3" high letters placed on the right hand side of lane #2 around the track ; Remove grease, oil, dirt, or other surface contaminants which would affect the appearance or performance of the painting work. Paint shall be applied by high pressure to assure penetration into coarse surfaces. Protect adjacent surfaces by masking or other means to eliminate overspray.