Specifications include, but are not limited to: •Venting of Pipeline No. 3 at six valve vaults. •Draining and disposal of liquid from Jones Island WRF drain vault. •Removal of drain piping at two valve vaults. •Draining and disposal of liquid from two valve vaults. •Removal of Pipeline No. 3 piping, fittings and valves at four valve vaults. •Hydro cleaning of Pipeline No. 3 at two valve vaults. •Removal, transportation and disposal of the hydro-cleaning water and solids. •Televised inspection of the hydro cleaned pipeline segments •Providing valves, piping and fittings at four valve vaults. •Providing temporary piping for pipeline insertion gauge (PIG) launching. •PIG cleaning of Pipeline No. 3 from two valve vaults. •Providing combination air release valves. •Replacing concrete pipe supports. •Hot tapping of piping if necessary.