In general the work consists of: This project will make renovations to the water supply/waste system, electrical/intercom/ fire alarm, heating/ventilation and minor fire protection upgrades to the North and South Cell Halls at the Green Bay Correctional Institution in the Village of Allouez. This project will be occurring inside a maximum security correctional institution while the facility is at full operating capacity. The North and South Halls consist of [296] cells each and house approximately [1,098] inmates. Only sixteen (16) cells can be remodeled at one time due to the security limitations or relocating the inmates to other cells. Four (4) phases have been granted special permission from GBCI for twenty (20) cells to be remodeled in that phase given existing utility constraints. Work in the cells will need to be completed in 36 construction phases at approximately three (3) weeks per phase.