Specifications include, but are not limited to: construct approximately 4,200 lineal feet of sanitary interceptor in sizes between 36 and 48-inch along the Military Ridge Trail and Cannonball Path in the Cities of Fitchburg and Madison. The project will install 12 new precast manholes, reconstruct 3 manholes, modify 2 manholes, and abandon the existing interceptor after reconnecting local flows. Miscellaneous smaller sizes of sanitary sewer are included in the project. Access for the project will be along the path which will be restored and repaved as part of the project. Other items included in the project are a relay of sections of forcemain, watermain, and storm sewer along with dewatering, tree removals, native restoration, and wetland restoration