Specifications include, but are not limited to: In general the work consists of the construction of new indoor fish hatchery facilities at the existing Kettle 41 Moraine Springs Hatchery (KMSH) site. The hatchery upgrade will construct a campus in the center of the 42 existing hatchery property. The proposed hatchery campus will include two fish culture modules (with 43 provisions for four (4) future modules), a new office and maintenance shop building, two well houses, three 44 process water supply wells, a new potable water well, water treatment plant building, and a waste water 45 treatment plant building. In addition to the new building construction. The proposed construction also 46 includes; site improvements, natural gas utilities, and upgraded three-phase electrical utility with centralized 47 back-up generators. The proposed project will fully integrate support facilities with highly efficient 48 production aquaculture equipment and systems. The hatchery modules are designed to provide top tier Bio49 Security for this industry.