Loading...
Skip to main content
< Back to results

JONES ISLAND WATER RECLAMATION FACILITIES BUILDING ROOFS REPLACEMENT PHASE 3


Location
Wisconsin
Publication Date
07/03/2019 01:59 PM EDT
Closing Date
08/15/2019 06:30 AM EDT
Issuing Organization
Milwaukee Metropolitan Sewerage District (MMSD)
Solicitation Number
Description

Specifications include, but are not limited to: Removal of built-up roof and replacement with single-ply roof at Buildings: JI 243 Chemical Unloading Facility (entire roofs) JI 245 Disinfection Building (entire roof) JI 247 Effluent Pump Station (entire roof) JI 256 Thickening Facility (entire roof) JI 257 Equalization and Blend Facility (Roof Areas 1, 2 and 3) JI 263C Inline Pump Station Surface Structure (entire roof) JI 268- 23, 24, 25 East Plant Gallery (entire roof) JI 289 Power House (Roof Areas 1 and 2) Removal and Replacement of fluid-applied roofs at Buildings: JI 257 Equalization and Blend Facility (Roof Areas 4 and 5) JI 263A Tunnel Ventilation Fan Building Removal of built-up roof and replacement with modified bitumen roof at Building: JI 289 Power House (Roof Area 3)

Get instant access

Get instant access to solicitation details & future business opportunities.

to solicitation details & future business opportunities.

Get Access

Vendor packages with access to similar open solicitations

Matching bid notifications & access to all Statewide & Group bid details

Statewide

Matching bid notifications & access to all Statewide & Group bid details

Matching bid notifications from participating agencies

Group

Matching bid notifications from participating agencies

Access participating agency bids

Basic

Access participating agency bids