Specifications include, but are not limited to: Provide removal, abandonment, rebuild, relocation, conversion and new replacement of the Interplant Sludge Pipeline corrosion monitoring systems including: • Removal and abandonment of anode headers and CP rectifiers. • Relocation of test stations • Rebuilding of pipe bond stations and test stations • Conversion to pipe bond stations • Providing new test stations and pipe bond stations Provide support for one pipeline continuity test by the Engineer including: • Labor and equipment to transport and operate the test apparatus Locating of discontinuous pipe joint bonds using the Divide and Locate Continuity Repair method including: • Excavations and temporary installation of test wires • Engineer will provide test apparatus and conduct the testing for locating • Labor and equipment to transport and operate the test apparatus Repair discontinuous pipe joint bonds including: • Excavation to expose the discontinuous joint bond • Replace all identified discontinuous pipe joint bonds Provide materials for pipelines repair.