Specifications include, but are not limited to: In general, the work consists of interior renovation of 3000 sq.ft. of classrooms on the first floor and 1020 42 sq.ft. of classroom on second floor. First floor has selective removal of partitions, ceilings, doors, and 43 finishes. The second floor selective removal of a two tier raised platform and floor finish. Project will 44 include drywall partitions, acoustical ceiling system, storefront glazing system, wood doors, and 45 interior finishes. Second floor work includes drywall partition and modifications to existing acoustical 46 ceiling system. The project includes electrical lower, lighting, AV, and fire alarm to accommodate the 47 new layout and campus equipment. Project will modify the existing HVAC system to accommodate the 48 new layout