Specifications include, but are not limited to: 1. The project consists of the removal and replacement of the original HVAC systems within the repair garage, lunchroom, staff office area, staff locker rooms, and parts storage, as indicated on the mechanical bid documents. 2. The project HVAC system(s) will be brought up to current code requirements and improve system operations, performance, and user comfort while increasing energy efficiencies. 3. Demolition work shall include the removal of existing gas fired unit heaters, combination AHU’s / gas fired duct heaters, vehicle exhaust fans, electric air cleaners, ductwork, condensate piping, gas piping, roof mounted RTU’s and exhaust fans, abandoned hot water radiant floor heating system and associated piping and other equipment as shown on the mechanical bid documents