Specifications include, but are not limited to: In general the work consists of the removal and replacement existing floor tile and base to improve water flow to drains. The work includes removal of existing floor tile, cove tile base and 1st row of wall tile; mud bed to achieve sloping installation of new floor tile; repair any waterproof membrane damaged during demolition; custom quartz thresholds/curbs; adjust drain flanges as needed; remove/undercut/reinstall solid core wood entry doors; pull up hallway tile carpet, feather floor as needed, reinstall carpet tile; raise/modify existing SSM clad plywood toilet partitions; perform final cleaning. Work to be completed in nineteen (19) multi-stall shower/toilet rooms.