Specifications include, but are not limited to: In general, the work consists of constructing a Department of Natural Resources Chronic Wasting Disease 39 Processing Facility on a site at the Game Farm located near Poynette, Wisconsin of appoximately 40,000 40 square feet of site and utility work to accommodate moderate automobile traffic for employees, circulation 41 for service vehicles and internal site circulation for skidsteer type equipment. 42 43 Processing Facility building consisists of a single level, 4,500 square feet of slab-on-grade insulated metal 44 building framing and enclosure including aluminum storefront & insulated glazing, exterior openings 45 including insulated doors and overhead panel doors. Interior construction is of steed stud and gypsum board 46 construction, hollow metal frames and doors and a minimal amout of architectural casework. Facility is 47 designed for one toilet facility and two toilet & shower facilities. Processing floor is designed with trench 48 drains and pitched to drain concrete slab.