Specifications include, but are not limited to: A. Site Work: 1. New concrete support and framing for placement of cooling tower. 2. Exterior pipe supports. B. Building Work: 1. Demolition: a. Removal of existing cooling tower, and associated piping as indicated in the construction documents. 2. Mechanical Piping Systems: a. Cooling Tower condenser water system including new cooling tower, condenser water piping, valves, and hydronic specialties as specified and required. 3. Mechanical insulation for piping systems, ductwork, and equipment as specified. 4. Complete controls and instrumentation. 5. System startup, testing, adjusting and balancing. 6. Piping and duct cleaning and pressure testing. 7. All pressure and temperature instrumentation not a part of any control system.