Specifications include, but are not limited to: In general the work consists of the removal and replacement of approximately 29,000 SF of failed and deteriorated roof coverings and completes all other associated ancillary work to maintain the building envelope integrity. Project work includes the replacement of the built-up roofing system (BUR) on the entire area with a new fully adhered 60-mil Ethylene Propylene Diene Monomer (EPDM) roofing system with tapered insulation to obtain an appropriate insulation value. Also included in this project is the replacement of the roof ductwork insulation. This work will involve removing of the existing insulation and jacketing on the rectangular and round ductwork and installing new 3” fiberglass insulation and an embossed aluminum jacket. The appropriate polyurethane caulk will be used at all jacketing penetrations and terminations. The existing 1,100 LF of metal coping will be removed and reinstalled after the new EPDM flashing is completed. 800+ LF of expansion will be replaced. In addition, the project provides site staging and a crane to deliver and remove roofing materials, as well as, disposal of all replaced roof coverings and materials.