Specifications include, but are not limited to: The project contemplated consists of replacement of four (4) non-clog dry pit centrifugal basin drain pumps and associated equipment. The equipment (Basin Drain Pump Nos. 1, 2, 3 and 4)are located within the basement of the East and West Aeration Buildings (Building 316 and 317)of the South Shore Water Reclamation Facility (SSWRF). The Bid consists of the following work in general: Remove the four (4) existing pump motors, motor support frames, pumps and pump pedestals. Remove the four (4) suction elbows from existing piping. Blast clean and epoxy coat the four (4) suction elbows, reinstall. Blast clean and epoxy coat the four (4) existing pump pedestals and motor support frames.