Specifications include, but are not limited to: In general, the work consists of selective demolition of interior partition walls and associated building 41 infrastructure (mechanical and electrical) and finishes; remodeling approximately 2,169 gross square feet on 42 floor B1 of Van Vleck Hall located at 480 Lincoln Drive and 3,629 gross square feet on the second floor of 43 Bascom Hall located at 500 Lincoln Drive. The project includes ADA and instructional technology 44 improvements to the following classrooms: Van Vleck Hall rooms B105, B107 and B113 and Bascom Hall 45 room 272. The work scope includes new mechanical grilles and ductwork (Van Vleck); new room finishes 46 for the floors, walls and ceilings; replacement of lighting with energy efficient fixtures; IT and Audio-Visual 47 upgrades. Work scope also includes extension of the existing sprinkler system in Van Vleck Hall to cover 48 the work area.