0002 201.0105 Clearing STA 2.000 _________._____ _________._____ 0004 201.0205 Grubbing STA 2.000 _________._____ _________._____ 0006 203.0220 Removing Structure (structure) 01. P-17- 0915 EACH 1.000 _________._____ _________._____ 0008 205.0100 Excavation Common CY 896.000 _________._____ _________._____ 0010 206.2001 Excavation for Structures Culverts (structure) 01. B-17-0238 EACH 1.000 _________._____ _________._____ 0012 210.2500 Backfill Structure Type B TON 1,050.000 _________._____ _________._____ 0014 213.0100 Finishing Roadway (project) 01. 7878- 03-70 EACH 1.000 _________._____ _________._____ 0016 305.0110 Base Aggregate Dense 3/4-Inch TON 58.000 _________._____ _________._____ 0018 305.0120 Base Aggregate Dense 1 1/4-Inch TON 815.000 _________._____ _________._____ 0020 311.0115 Breaker Run CY 110.000 _________._____ _________._____ 0022 312.0110 Select Crushed Material TON 1,022.000 _________._____ _________._____ 0024 455.0605 Tack Coat GAL 45.000 _________._____ _________._____ 1.00000 0026 460.2000 Incentive Density HMA Pavement DOL 140.000 140.00 0028 460.5223 HMA Pavement 3 LT 58-28 S TON 111.000 _________._____ _________._____ 0030 460.5244 HMA Pavement 4 LT 58-34 S TON 94.000 _________._____ _________._____