● Remove and dispose of all Category I, Category II and RACM materials and Universal Wastes listed in the Pre-demolition Inspection Report dated June 2023. ANY EXTERIOR WINDOWS OR DOORS THAT ARE REMOVED DURING THE ABATEMENT MUST BE BOARDED. ● Raze and remove all debris from structures and parcels, including any footings, basement walls and floors. ● Remove private concrete pavement and walkways surrounding buildings. ● Remove and replace any sidewalks and curbing marked by City. ● Remove and stump all trees, stumps, scrub trees and brush including brush on east of fence line. Except the two large trees on the north side of the properties. ● Remove fence along east property line. ● Remove and cap at curb the sanitary sewer and water laterals. PLEASE NOTE: The location of the sanitary sewer and water laterals is not always accurate. Bidders should be prepared to “camera” the sanitary sewer laterals to determine exact location. ● Backfill, grade and seed site after razing in accordance with general specifications and Erosion Control Plan. ● Obtain necessary Federal, State and local permits.