Specifications include, but are not limited to: Contractor shall be solely responsible for the accuracy of measurements and coordinating and scheduling their own work. Any errors due to faulty measurements taken, information obtained, layout, or failure to report discrepancies will not result in any additional compensation for the Contractor. All lawn areas in the site plans provided within this specification will be mowed at the appropriate height identified. The frequency will be determined by on-site inspection taking into consideration the moisture content, soil conditions and the type of grasses. The lawn mowing season will begin on May 1 of each year of this Contract, and end on October 31, or as mutually agreed upon due to weather conditions. If services are needed prior or past above listed dates, it must be preapproved by area superintendent. Mowing shall take place on an as-needed basis. There will be only TWENTY (20) cuttings between July 1 of the current calendar year thru June 30 of the next calendar year. More cuttings during this time period will NOT be allowed, unless pre-authorized by site superintendent. The grass shall be mowed at an average height of THREE (3) inches in primary areas and FIVE (5) inches in the alternate areas (if alternate areas are identified).