Specifications include, but are not limited to: The Portage County Highway Department is seeking professional engineering services for the following projects: 1.3.1. Project 1– CTH R (Black Oak Drive – Porter Road), Village of Plover Construction Services 1.3.1.1. Project Description: The improvements include the reconstruction of CTH R with a 2-lane facility with a two-way left turn lane, a new structure over the Little Plover River, and a 10- foot wide multi-use path along the west side of the roadway. The County has consulted with engineering firm AECOM to design these improvements and Corre, Inc. to complete the real estate acquisition. The project is approximately 1.4 miles in length and is construction is estimated at $3.6 million. 1.3.1.2. Scope: The project will need full time construction oversight and inspection services with an experienced construction leader. 1.3.1.3. Schedule: The project will be let by the County this winter with construction occurring during the 2023 construction season. 1.3.1.4. Funding: This is a county let and funded project that is partially funded with a $1 million grant from the DOT’s Multi-Modal Local Supplement Program. 1.3.2. Project 2 – Linden Road Bridge P49-06 Replacement, Town of Alban Construction Services 1.3.2.1. Project Description: The improvements include the replacement of structure P49-06 on Linden Road over Flume Creek in the Town of Alban. The new structure is designed by Westwood, Inc. and will be a 36’ slab span bridge supported on CIP concrete piling. 1.3.2.2. Scope: The project will need part time construction oversight and inspection services with an experienced construction leader. 1.3.2.3. Schedule: The project will be let by the County this winter with construction occurring during the 2023 construction season. The construction contract will be a 40-day working contract. 1.3.2.4. Funding: This is a county let and funded project that is part of the County’s bridge/culvert aid program in which the town is responsible for half of the costs. 1.3.3. Project 3 – Bluebird Road Structure Design, Town of Carson 1.3.3.1. Project Description: The improvements will include the replacement of the Bluebird Road structure over a tributary to Mill Creek. 1.3.3.2. Scope: The project will include the H&H analysis, structure sizing, permitting, and structure design, utility coordination, plans, estimate, and special provisions. The current structure is a single span structure and the town has a preference for multiple culverts. At least three structure types should be evaluated: single span cast-in-place and two culvert options. 1.3.3.3. Schedule: The project will be designed in late 2022/early 2023 with a county let in 2023 or 2024. 1.3.3.4. Funding: This is a county let and funded project that is part of the County’s bridge/culvert aid program in which the town is responsible for half of the costs.