Frank Elementary School: Installation of an existing Synergy Modular Play Structure (concrete slab bolted installation). Installation of a PIP playground surface within an existing asphalt playground area on top of a new curbed 5” concrete pad. Site excavation and subbase installation, asphalt cutting / patching and site restoration is included in this scope. This Play Structure is currently in storage at our KUSD warehouse. Contractor is to inventory the existing parts and provide any replacement or missing parts as part of this contract. Contractor will be responsible for the delivery of the playset components from our KUSD Warehouse to the Frank School site. Curtis Strange Elementary School: Installation of an existing relocated Synergy Modular Play Structure (Direct Burial Installation). Installation of PIP playground surface within an existing asphalt playground area. Site excavation and subbase installation, new concrete curbing, asphalt cutting / patching, and site restoration is included in this scope. Contractor will be required to remove and relocate the existing playset structure from Wilson School Site (Location 3) to Curtis Strange. Contractor is to inventory the existing parts and provide any replacement or missing parts as part of this contract. Wilson Elementary School: The existing PIP surface at Wilson will remain after equipment removal. The concrete curb and associated PIP material at Wilson will all be removed by KUSD.