1. Structured Cabling Installation: New Category 6 cable will be installed from existing IDF/equipment cabinets to each designated workstation location as shown on the provided drawings, including proper termination at both ends. 2. Pathway Infrastructure: All necessary conduit and pathway systems including conduit stubs, ceiling-mounted J-hooks, surface mount raceway, surface mount boxes, cable trays, and wire management systems required for concealed cable installation. 3. Hardware and Terminations: Supply and install all jacks, faceplates, patch panels, wire managers and associated mounting hardware. All connections must meet or exceed TIA/EIA-568 standards. 4. Testing and Documentation: Perform comprehensive cable testing per TIA/EIA standards, provide test results documentation, cable labeling system consistent with existing infrastructure, and as-built drawings showing actual cable routes and termination points. 5. Project Completion: Site cleanup, removal of all construction debris, and restoration of all disturbed areas to original condition or better.