1. Asphalt Replacement - Parking Lot: Mill and replacement of existing asphalt parking lot with new asphalt. Restripe parking lot to maximize parking quantity and efficiency of drop-off / pick-up vehicle circulation, coordinate layout closely with District. Include all paint striping. 2. Asphalt Replacement – Drive Lane: Mill and replacement of existing asphalt vehicle drive with new asphalt. In addition to vehicle circulation, the proposed solution to account delivery truck, garbage truck, and bus traffic. Include all paint striping. a. Asphalt Widening – Multiple Locations: Expand existing asphalt drives in areas as indicated. Expansion to align with adjacent asphalt replacement projects for seamless finished product. Include all paint striping. 3. Asphalt Replacement – Playground: Mill and replacement of existing asphalt playground surface with new asphalt. Final playground striping to be coordinated with District. Include all paint striping. 4. Concrete Sidewalk, and Curb / Gutter Replacement: Replace existing concrete sidewalk with new concrete surfaces. Replacement of the existing concrete curb and gutter with new concrete 18” curb and gutters. New concrete to be synthetically reinforced, 4,000psi, saw-cut control joints, with color / texture to match existing concrete surfaces (or as recommended). 5. Rolled Face Concrete Curb: Installation of new concrete roll faced concrete curb. New concrete to be synthetically reinforced, 4,000psi, saw-cut control joints, with color / texture to match existing concrete surfaces (or as recommended). 6. Concrete Driveway Installation: Installation of new 12’ wide concrete driveway. New concrete to be synthetically reinforced, 4,000psi, saw-cut control joints, with color / texture to match existing concrete surfaces (or as recommended).