Specifications include, but are not limited to: Contractor shall shovel gate area to ensure proper functioning. Contractor shall clear and de-ice sidewalks and entryways.. Contractor shall complete all snow shoveling/clear accumulated snow and Ice from all exits, doors, overhead doors, passageways, driveways, mailboxes, and sidewalks and lots according to the Site Map (Exhibit A) for that site and prior to 7:00 a.m. No windows are to block any doorway, sidewalk or drive (plowed or unplowed). Snowblower discharge shall at all times be directed away from all buildings, vehicles, and people. Contractor shall not use street legal vehicles or heavy equipment (including but not limited to skid steers, graters, pickup trucks w/ plows) on sidewalks. Contractor shall clear accumulated snow and make a path for access to fire hydrants, sprinkler feeds and standpipes to maintain unrestricted access to utilities for facility and emergency personnel.