The Project includes the following Work: The project consists of constructing paved multi-use path from CTH PP to South Koro Road within the City of Ripon, Fond Du Lac County. The work includes construction of a new section of paved path, unclassified excavation, aggregate base course, asphalt paving, installing rounded beam guard ends, pavement markings, and assorted path signage. Specifically the work includes the following: 1 L.S. Unclassified Excavation 1 L.S. Traffic Control 1 L.S. Turf Restoration 2,600 S.Y. Furnish & Install Erosion Mat Class 1 Type B Urban 40 LF Furnish & Install 15-Inch Dia. RCP Class 4 Storm Sewer 15 L.F. Furnish & Install 24-Inch Dia. RCP Class 4 Storm Sewer 1 EA Furnish & Install 15-Inhc Dia. Apron End Wall 2 EA Furnish & Install 24-Inch Dia. Apron End Wall 50 C.Y. Furnish & Install Medium Fractured Rip-Rap 3,650 S.Y Furnish & Install 6-Inch Thick Granular SubBase Course 3,650 S.Y. Furnish & Install 6-Inch Thick Crushed Aggregate Base Course 950 S.Y. Furnish & Install 3-Inch Thick Aggregate Shoulder, ¾-Inch 2,550 S.Y. Furnish & Install 3-Inch Thick Asphaltic Pavement 50 LF Furnish & Install Concrete Curb 250 SF Furnish & Install 6-Inch Thick Concrete Sidewalk 10 EA Furnish & Install Permanent Sign, Reflective 150 L.F.